Solar Case Study – Karratha Airport  | Commercial Solar Power by Energy Matters

Energy Matters has collaborated with multiple stakeholders to deliver an innovative 1MW solar project for the City of Karratha at Western Australia’s second-largest airport, Karratha Airport.

Karratha Airport provided a crucial link to the Pilbara region, with multiple daily services from Perth, twice-weekly flights to Broome and weekly services to Sydney, Melbourne and Brisbane.

It was a very busy place – passenger numbers at the airport increased from 207,458 in 1985-86 to 798,301 in 2011-12.

A reliable, long-term energy solution was crucial to meeting Karratha Airport’s increasing electricity demands.

Karratha Airport Solar Project

Did you know Energy Matters is Australia’s largest renewable news, blog and educational resource? Subscribe to Energy Matters’ weekly newsletter and keep updated even with incentives, rebates and recommended solar product offers.

Project overview

Location

Karratha, WA

System Size

1MW

Estimated Annual Production

1,871 MWh

Estimated Annual Carbon Offset

1,254 tonnes

Solar Panels

340W

Solar Inverter

SMA Sunny Tripower

Mounting System

SunLock

Special Features

Cloud Predictive Technology

The land on which the airport site is located covers a total of 722 hectares – providing plenty of space for solar panels.

After this opportunity was identified, Webster Power Company sought construction and technology partners, along with funding from the Australian Renewable Energy Agency (ARENA).

Energy Matters was approached to assist with delivering a cost-effective solar project, which would also be connected to the North West Interconnected System (NWIS).

There were some unique challenges in planning and designing the project.

The NWIS is a smaller network that has historically required renewable energy systems to meet specific criteria to maintain overall network stability.

Network owner and operator Horizon Power has required significant levels of energy storage for large solar installations to smooth output intermittency.  This requirement was due to intermittent cloud cover, which can result in huge, sudden variations in solar electricity output.

To address this, the facility implemented a generation management system (GMS) with cutting-edge cloud-predictive technology (CPT) from MPower. It was the first time cloud predictive technology was utilised on a network-connected solar power installation of this magnitude.

When the cloud was detected, CPT slowly reduced the power supply from the solar panels before the sun was completely blocked. Using CPT reduced the need for energy storage.

Constructed by CPS National, the clean power plant also featured high-performance 340-watt solar panels and SMA Sunny Tripower solar inverters. The facility was expected to generate 1,871 MWh of clean electricity annually and to avoid 1,254 tonnes of carbon emissions.

The City of Karratha purchased the energy produced by the facility under a 21-year Power Purchase Agreement (PPA). The move to a solar PPA ensured long-term security for energy supply and locked in electricity pricing.

 

The $7.1 million project was supported by the Australian Renewable Energy Agency (ARENA), which contributed $2.3 million. The funding was granted because the project met ARENA’s objectives of reducing costs and increasing the use of renewable energy in Australia.

Considering a commercial-scale solar project? Contact us today, and we can begin to build your solar system in Melbourne together.

Is solar energy suitable for your business in WA?

Solar energy offers numerous advantages worth investigating. Investing in solar will minimise your operational costs, reduce your company’s carbon footprint, and prepare it for the future. A commercial property with a solar installation is excellent for business. Get up to 3 FREE solar quotes from commercial solar firms we’ve pre-qualified and vetted for their track record of delivering Australia's best business solar systems.
Footer subscribe

By submitting your contact details provided on this form you are giving consent for one of our Solar Partners to contact you by Phone, Email, or SMS for a period of 90 days to discuss the solar-related products you have enquired about today. Your consent can be revoked at any time by either verbal or written confirmation.